This page is a study and review of alternatives is to alleviate flooding and allow for emergency vehicles to travel in the public right-of-way and improve emergency response.
In October 2012, the Town of Greenwich and the U.S. Army Corps of Engineers (ACOE) initiated a cost shared feasibility level study to determine if flood risk management opportunities are advisable for the Byram River Basin, Connecticut and New York.
The Town of Greenwich, Department of Public Works, Engineering Division is required to complete dry-weather screening for all MS4 outfalls and provide the results to CT DEEP in their annual reports.