Bridges

  •    Round Hill Road Bridge (No.05489) over Converse Pond Brook
        The Engineering Division will be replacing the Round Hill Road Bridge in its entirety. The bridge  
        is located on Round Hill Road between Porchuck Road and the Rt-15 southbound off ramp.
  •    Bailiwick Road Bridge (No. 05491) over the Byram River  
       The Engineering Division has commenced replacing the Bailiwick Road Bridge in its entirety through the Federal
       Local Bridge Program. The bridge is located on Bailiwick Road at the intersection of Riversville Road and crosses
       over the Byram River. 
  •   Sunshine Avenue Bridge (No. 056016) over Binney Park Brook
      The bridge is in semi-final design phase. Construction anticipated to being in Spring 2019.
  •   Davis Avenue Bridge (No. 05012) over Indian Harbor 
      The bridge is in design phase.  Construction anticipated to begin in Spring 2020.
  •    Oneida Drive Bridge (No. 056009) over Smith Cove         
      Design is complete and construction is anticipated to begin in Spring 2019.                          
  •    Wesskum Wood Road Bridge (No.056019) over Binney Park Brook 
        Currently in the process of selecting a design consultant.  Construction is anticipated to begin in       Spring 2020.