Asphalt Paving Program

The Highway Division will begin its Spring 2020 roadway reclamation and paving season on Monday May 11th, 2020. Access to homes will be provided at all times, and police officers and/or traffic flaggers will be on site to help direct cars and pedestrians through the work zones. Short term delays are to be expected and we suggest alternate routes be utilized when possible. Please excuse the temporary disruptions and thank you in advance for your patience and cooperation during this project.

Street Name
From
To
Azalea Terrace
Mimosa Drive
Cul-De-Sac
Gregory Road
Valley Road
Cul-De-Sac
Licata Terrace
Windsor Drive
Sundance Drive
Ronald Lane
Gregory Road
Cul-De-Sac
Sundance Drive
Cognewaugh Road
Cul-De-Sac
Windsor Drive
Valley Road
Cul-De-Sac
Wyndover Lane
Sundance Drive
Cul-De-Sac

How are roads selected for paving?
Paving of Town roads is determined by several factors

  • Functional Class
  • Pavement Condition Index as determined in 5-year roadway surveys
  • Capital Budget
  • Utility Company Coordination of Projects

Roads are scheduled for paving by the following factors:

  • Weather
  • Traffic Patterns
  • Mechanical Breakdowns
  • Community Events

What techniques are used to maintain Town roads?

  • Paving – Hot Mix Asphalt
  • Milling – Removal of top layer of asphalt
  • Reclaiming – Pulverizing existing road base and repaving
  • Micro-Surfacing – Asphalt surface treatment
  • Crack Sealing
  • Re-striping of traffic markings

Seasonal Influences

  • Asphalt Plants are typically operational during warm weather months
  • Asphalt Paving Program is generally conducted from May through September
  • During the summer months, when schools are not in session, traffic may be lighter